2017-05-24: Floor underlay and rust treatment

This week, I’ve been continuing work on the floor. Before we can lay the new plywood floor down, we need to fill the grooves with closed cell foam, and then add a layer of underlay. For this piece, I used the Soudal High Tack adhesive to stick down the foam.

Meanwhile Amy continues on the rust treatment, now fixing up the few dings and patches of rust on the outside of the van.

Laying foam strips and underlay underneath the new floor panels
Rusted dents and scratches on the roof where the previous owner has encountered some low-hanging branches
Prepping the rusted areas for treatment and new paint